Tuesday, September 25, 2007

First Day of Work

The guys got off to a quick start on Monday around eight in the morning and, by the end the day, had the entire inside cleared out save the skeleton of the shop and the plank flooring. They took down the extra timbers, the granary, the bay dividers, a large portion of the shop and some sections of flooring and set all of the good wood very neatly on the deck. All in all, it was a very good day's work.

Taking down the extra timbers



Opening up the bay dividers and granary



Getting down to the bones of the shop...
the bat guano above will be tackled on Tuesday in protective suits



The neatly stacked wood and timbers



The floor starts to come up. You can see the insulation and drywall ceiling of the lower barn.