Yesterday, Monday, the guys finished installing a 4x4 support truss along the two long sides of the barn. This will provide added strength and stability to the future floor system. And hopefully make it flat.


As the current timbers are too far apart to make for a stable floor, they will be adding some micro-laminate wood I-beams to further support the subfloor. These "micro-lam" beams are about 32 ft. long and can span the entire breadth of the barn.