Half of the 2nd floor joist and subfloor has been laid and work is set to begin on the sheer wall, basically a sheet of 3/4" plywood on either side of the timbers that divide the two bays of the barn that include the 2nd floor. We need to make a few cuts to main beams for doorways upstairs and the plywood sheer wall will run from the floor to the peak of the roof to maintain stability.