
Over half of the barn is now fully sided

The clapboards change to shakes at the gable

The porch concrete is poured and awaits future flagstone

The cement is flush to the door hole now, but will sit 1/4" below the threshold when all is said and done

Siding work continues on the South wall
No comments:
Post a Comment