
The salamanders have arrived!

Drywall finishing on the exterior walls continue

Mike puts sleepers down in the kitchen loft to level out the subfloor

The kitchen gets framed out to ease cabinet installation

The front porch concrete was sloped wrong and had to be replaced

The windows are replaced in the shop doors down below
No comments:
Post a Comment