
Permitted and inspected, this caged bird can fly again!

The drywall has been delivered and is being hung, with Oscar at the helm

Upstairs will be hung first and then the main floor

The timbers crossing the doorways upstairs have been cut and the barn didn't collapse. Good news!

Backer rod and fiberglass insulation will stop drafts from sneaking around the windows

The sconces, which will shoot light vertically in both directions along certain beams have been forged and received

A mock-up of our cherry kitchen cabinets by Duane Brensinger

A look at Scott's future floor mosaic
No comments:
Post a Comment