The interior wall framing continues while the exterior walls (SIPs) go up. It looks as though the rain is done for the week, so hopefully the mud will subside enough for wheelchair access.
You can see the SIP progress along the left wall as well as interior framing in the center
The wall between the sitting room/bathroom and stairs/great room is installed
The ladder may stop a bit short, but it adds great character
No comments:
Post a Comment