Friday, April 25, 2008

The Doldrums

As we wait for final permits and inspections, not much is happening. Hopefully that will all be rectified by the middle of next week.

The South side, from a never before seen wide angle



A longer, more gentle ramp is installed



Our deckside apple tree is blossoming nicely



A little more duct work has been completed



Siding goes on, at a medium pace


Monday, April 14, 2008

Stormy April Days

The new windows are all installed in the lower doors



The new concrete porch area is poured



A ramp to the deck is placed



Floodlights are in on the corners of the house



Uplighting on the beams will illuminate up to the peak of the roof



Electricity comes to the newly framed kitchen



Forget ladybugs, now guinea pigs have attacked!

Saturday, April 5, 2008

Spring Is Here!

The salamanders have arrived!



Drywall finishing on the exterior walls continue



Mike puts sleepers down in the kitchen loft to level out the subfloor



The kitchen gets framed out to ease cabinet installation



The front porch concrete was sloped wrong and had to be replaced



The windows are replaced in the shop doors down below