Thursday, January 10, 2008

Long Time No See

3 weeks have passed, as has vacation. The kitchen loft is going in and all of the framing is pretty much done throughout the house, plus the Raupanel for our radiant floor arrived today. The electricians are working while the plumber and roofer are getting ready and the windows arrive on Tuesday!


The kitchen loft is framed with the old barn floor that was too full of nails to be remilled.



The kitchen loft underside in progress. The joist is made up of the old barn floor as well.



Electric work continues.



The spot where the main horizontal beams upstairs will be cut for a doorway is framed.



Timbers stretch across a void to allow for lighting closer to the workspace.



A space above the upstairs bedroom closet for an air handler and mechanicals.



The vaulted ceiling of the storage room upstairs.